Results
INTECSEA successfully supported Hess through its stage gate processes, we successfully recommended a single field development concept fully considering and documenting technical and economic aspects of subsea, floating systems and topside facility design, as well as non-economic risks.
We were able to ensure the:
- Technical assurance of deepwater technologies and of the integration/interfacing of subsea, floating systems and topside facilities.
- Latest fabrication and installation costs, with due consideration of appropriate contingencies given project uncertainties.
- In line with the business plan, Hess successfully farmed-out 50% license ownership; INTECSEA technical and commercial assurance was key to the farm-out process.
- The follow-on SURF Pre-FEED was awarded to the INTECSEA Houston office. Continuing the strong INTECSEA-Hess relationship