Case Study

Transforming a loss making site into a profitable strategic European hub

men in factory doing quality control

Transforming a loss making site into a profitable strategic European hub

The Situation

Our client’s site was operating at 20% of historical capacity. Several issues existed:

  • Declining poor performance and engrained, poor safety and performance management behaviours
  • Declining market share in some products facing fierce Asian competition with lower unit costs
  • Lack of coordination between internal sales companies and manufacturing supply chain
  • Inadequate planning and reporting with ineffective execution control systems
  • Limited use of short interval controls, KPIs and root cause analysis
  • Very high levels of all types of inventory and low customer service levels
  • Poor track record of delivering capital expenditure projects

Approach

  • Developed and installed robust planning, production scheduling and customer service processes
  • Implemented an effective execution control system that introduced short interval controls and KPIs with a focus on data driven performance
  • Implementation of robust inventory, warehousing and logistics management processes and controls
  • Established capital projects management and contractor management processes
  • Deliver leadership and supervisory coaching to transform the performance management culture, focusing on achieving proactive safety and performance targets

Results

  • Significantly higher levels of site performance (a 44% increase in On-time In Full (OTIF)) and increased levels of management control and consistency
  • Robust long, medium and short term production plans
  • Significantly lower levels of inventory (38% reduction)
  • More effective and confident leadership team
  • Increased workforce productivity (up 42%) utilised in a more cost-effective manner
  • Improved communication and coordination between departments with common goals and objectives
  • Short interval controls installed on all critical processes
  • Creation of a continuous improvement system and culture
  • Successful coordination and execution of strategic capital projects (on time and within budget)